top of page
Laverna Extension

CLIENT TESTIMONIAL

"I actually just got them to do the prefab, but when i saw their craftmanship i also got them to do my interiors. Kahit yung modular kitchen namin ganda ng gawa nila."

- MARY SIMACON

"Dali ra kaayo nila nainstall ang akoa units. Sulod kaayo sa budget ug limpyo ang pagbuhat. Mailhan jud na dekalidad sila motrabaho. Salamat kaayo!"

- JULIET PO

"Very fast set-up. One model unit only took 2 days for installation. We are very impressed and highly appreciative of all the timely and exceptional work done on our happy new home."

- LARISSA GARCIA

"Finished in 3 hours, very fast!"

- JUSTIN LU

TWO STOREY REST HOUSE

The biggest contrast between prefab and conventional construction? The time it takes to build. While it typically takes 9 to 12 months for a skilled conventional contractor to complete a project like this, we're proud to announce that we wrapped up construction in just 3 months!

Lahat ng bumibisita sa new house ko ay na-amaze sa idea ng Prefab Housing. Madali lang rin ipacustomize at masaya ako sa resulta. Maraming salamat!

- FRANK HERNANDEZ

2 STOREY DORMITORY

PROJECT COMPLETION COMPARISON

  • HYBRID MODULAR + CEMENT = 90 DAYS

  • CONVENTIONAL FULL CEMENT = 365 DAYS

DORMITORY

2 STOREY DORMITORY 

A 24 unit dorm with reinforced beams

with outstanding durability, time-saving,

and cost efficiency.

Lot Area: 432 sqm (18 m x 24 m)

Prefab: 24 Units

Floor Area: 630.00 sqm

PHP/SQM:

Features:

12 Bedrooms, T&Bs

OFFICE EXTENSION

PROJECT COMPLETION COMPARISON

  • PREFAB = 14 DAYS

  • CONVENTIONAL FULL CEMENT = 60 DAYS

office extension

OFFICE EXTENSION

This is our first project to connect new prefab

units to an existing building using a small bridge.

Prefab: 4 Units

PHP/SQM: 

Features:

Office Areas

REST HOUSE

PROJECT COMPLETION COMPARISON

  • PREFAB = 60 DAYS

  • CONVENTIONAL FULL CEMENT = 240 DAYS

 REST HOUSE

REST HOUSE

 

This Prefab Rest House is elevated using column

pedestals, it offers stunning views of the surrounding landscape.

Prefab: 4 Units

PHP/SQM: 

Features:

Master Bedroom w/ WIC and T&B, Bedrooms, Kitchen, Outdoor Deck, T&B

HYBRID MODULAR CEMENT

PROJECT COMPLETION COMPARISON

  • HYBRID MODULAR + CEMENT = 33 DAYS

  • CONVENTIONAL FULL CEMENT = 180 DAYS

HYBRIDMODULAR

REST HOUSE

The rest house for hospitable guest entries

in which the design shows the presence

of welcomeness and openness.

Lot Area: 180 sqm (12 m x 15 m)

Prefab: 4 Units

Floor Area: 108.00 sqm

PHP/SQM: 

Features:

Family Area, Kitchen, Dining Area, Office Area,

Entertainment Area, Bedroom, T&Bs

BOARDING HOUSE

PROJECT COMPLETION COMPARISON

  • MODULAR = 14 DAYS

  • CONVENTIONAL FULL CEMENT = 90 DAYS

BOARDINGHOUSE

BOARDING HOUSE

A 6 doors studio type unit made out of 3 prefabricated container type of structure.

 

Lot Area: 194 sqm
Prefab: 3 Units
Floor Area: 49.5 sqm
PHP/SQM:

Features:
6 Studio Type Rooms, Kitchen, Dining Area, T&B, Parking Space

WAREHOUSE MEZZANINE

PROJECT COMPLETION COMPARISON

  • MODULAR = 14 DAYS

  • CONVENTIONAL FULL CEMENT = 60 DAYS

WAREHOUSE

WAREHOUSE MEZZANINE

Mezzanine office space made out of 3 prefabricated container units and 1 unit office space underneath.

 

Prefab: 4 Units
Floor Area: 66 sqm

PHP/SQM:

Features:
Office Space, Glass Walls, Industrial Stairs & Railings

MINI-MART CONCEPT

PADADA

MINI-MART CONCEPT ​

 

A Prefab mini-mart / residential building concept in Padada, Davao del sur made out of 4 Pabricated units

Prefab: 4 Units

Floor Area: 108.00 sqm

Features: Ground Floor: 3 unit combined open space for mini-mart display Second floor: 1 unit with bed, T&B, Kitchen and Dining Area Open deck with railings and secondary roof

TEFASCO

MODULAR OFFICE

COSTA PACIFICA RESORT

REST HOUSE COINTAINER

MODULAR OFFICE

A LUXURIOUS REST HOUSE

luxurious house

REST HOUSE

 

A true masterpiece composed of two prefab units, offering a complete array of amenities for a truly luxurious experience.

Prefab: 2 Units

Floor Area: 127.00 sqm

Features: Ground Floor: 2 unit 

Master Bedroom, Shared Bedroom, Living Area, Dining Area, Kitchen T&Bs

bottom of page