CLIENT TESTIMONIAL
"I actually just got them to do the prefab, but when i saw their craftmanship i also got them to do my interiors. Kahit yung modular kitchen namin ganda ng gawa nila."
- MARY SIMACON
"Dali ra kaayo nila nainstall ang akoa units. Sulod kaayo sa budget ug limpyo ang pagbuhat. Mailhan jud na dekalidad sila motrabaho. Salamat kaayo!"
- JULIET PO
"Very fast set-up. One model unit only took 2 days for installation. We are very impressed and highly appreciative of all the timely and exceptional work done on our happy new home."
- LARISSA GARCIA
"Finished in 3 hours, very fast!"
- JUSTIN LU
TWO STOREY REST HOUSE
The biggest contrast between prefab and conventional construction? The time it takes to build. While it typically takes 9 to 12 months for a skilled conventional contractor to complete a project like this, we're proud to announce that we wrapped up construction in just 3 months!
Lahat ng bumibisita sa new house ko ay na-amaze sa idea ng Prefab Housing. Madali lang rin ipacustomize at masaya ako sa resulta. Maraming salamat!
- FRANK HERNANDEZ
2 STOREY DORMITORY
PROJECT COMPLETION COMPARISON
-
HYBRID MODULAR + CEMENT = 90 DAYS
-
CONVENTIONAL FULL CEMENT = 365 DAYS
2 STOREY DORMITORY
A 24 unit dorm with reinforced beams
with outstanding durability, time-saving,
and cost efficiency.
Lot Area: 432 sqm (18 m x 24 m)
Prefab: 24 Units
Floor Area: 630.00 sqm
PHP/SQM:
Features:
12 Bedrooms, T&Bs
OFFICE EXTENSION
PROJECT COMPLETION COMPARISON
-
PREFAB = 14 DAYS
-
CONVENTIONAL FULL CEMENT = 60 DAYS
OFFICE EXTENSION
This is our first project to connect new prefab
units to an existing building using a small bridge.
Prefab: 4 Units
PHP/SQM:
Features:
Office Areas
REST HOUSE
PROJECT COMPLETION COMPARISON
-
PREFAB = 60 DAYS
-
CONVENTIONAL FULL CEMENT = 240 DAYS
REST HOUSE
This Prefab Rest House is elevated using column
pedestals, it offers stunning views of the surrounding landscape.
Prefab: 4 Units
PHP/SQM:
Features:
Master Bedroom w/ WIC and T&B, Bedrooms, Kitchen, Outdoor Deck, T&B
HYBRID MODULAR CEMENT
PROJECT COMPLETION COMPARISON
-
HYBRID MODULAR + CEMENT = 33 DAYS
-
CONVENTIONAL FULL CEMENT = 180 DAYS
REST HOUSE
The rest house for hospitable guest entries
in which the design shows the presence
of welcomeness and openness.
Lot Area: 180 sqm (12 m x 15 m)
Prefab: 4 Units
Floor Area: 108.00 sqm
PHP/SQM:
Features:
Family Area, Kitchen, Dining Area, Office Area,
Entertainment Area, Bedroom, T&Bs
BOARDING HOUSE
PROJECT COMPLETION COMPARISON
-
MODULAR = 14 DAYS
-
CONVENTIONAL FULL CEMENT = 90 DAYS
BOARDING HOUSE
A 6 doors studio type unit made out of 3 prefabricated container type of structure.
Lot Area: 194 sqm
Prefab: 3 Units
Floor Area: 49.5 sqm
PHP/SQM:
Features:
6 Studio Type Rooms, Kitchen, Dining Area, T&B, Parking Space
WAREHOUSE MEZZANINE
PROJECT COMPLETION COMPARISON
-
MODULAR = 14 DAYS
-
CONVENTIONAL FULL CEMENT = 60 DAYS
WAREHOUSE MEZZANINE
Mezzanine office space made out of 3 prefabricated container units and 1 unit office space underneath.
Prefab: 4 Units
Floor Area: 66 sqm
PHP/SQM:
Features:
Office Space, Glass Walls, Industrial Stairs & Railings
MINI-MART CONCEPT
MINI-MART CONCEPT
A Prefab mini-mart / residential building concept in Padada, Davao del sur made out of 4 Pabricated units
Prefab: 4 Units
Floor Area: 108.00 sqm
Features: Ground Floor: 3 unit combined open space for mini-mart display Second floor: 1 unit with bed, T&B, Kitchen and Dining Area Open deck with railings and secondary roof
MODULAR OFFICE
COSTA PACIFICA RESORT
REST HOUSE COINTAINER
MODULAR OFFICE
A LUXURIOUS REST HOUSE
REST HOUSE
A true masterpiece composed of two prefab units, offering a complete array of amenities for a truly luxurious experience.
Prefab: 2 Units
Floor Area: 127.00 sqm
Features: Ground Floor: 2 unit
Master Bedroom, Shared Bedroom, Living Area, Dining Area, Kitchen T&Bs